Computer Networking · Advanced level

Advanced level · Module 5: Network Operations and Careers · Lesson 3 of 4

Procurement and Equipment Lifecycle

Buy the right equipment at the right cost and replace it on time.

In this lesson you will

  • Write a bill of materials
  • Plan equipment lifecycle and support

Key concepts

requirements-based specificationbill of materialswarranty and supportend of life

The lesson

Specify equipment from requirements: ports, throughput, PoE for access points, management features and support.

A bill of materials lists every item, quantity, unit price, total and supplier, including cables, racks and power.

Track warranty, support and end-of-life dates and budget for replacement.

Step by step

  1. Write specifications.
  2. Collect quotes.
  3. Build the bill of materials.
  4. Record lifecycle dates.

Practice activity

Build the costed bill of materials for the capstone design.

Expected result: A complete, costed bill of materials.

Check your understanding

  1. What is PoE used for?

    Show answer

    Powering devices such as access points through the network cable.

  2. Why track end-of-life dates?

    Show answer

    To replace equipment before it loses support.

Taught live by an instructor — online or in person. Free course lessons are for self-study and do not lead to a certificate — see registration options.